I started the wiring work, now I go to cut an aluminum plate to make the internal panel of keys and fuses. With the new panel I will be able to finish the wiring of the mobile base of Golias V2.
All the news that's fit to assimilate
[ Home | Blogs | Events | Robots | Humans | Projects | Podcasts | About | Account ]I started the wiring work, now I go to cut an aluminum plate to make the internal panel of keys and fuses. With the new panel I will be able to finish the wiring of the mobile base of Golias V2.
Today I fixed the boards of hbridges in its new places. I had that to retouch the painting in some points. Everything soon for the wiring now.
Today I changed the distribution of the boards of the Golias HBridges. When I prepared the wiring I came the new idea of where they would have to be fixed and this saved much space and electric wire. The wiring was stops after fixing the boards again.
Finally I finished the painting work. Now, I start to install the mechanics and the power sources and hbridges. I intend to test these systems in the next Sunday.
I finish the two power supplies, one with "clean" power for logic circuits and other for motors and drivers. Golias V2 have a single battery for circuits and motors. I finish and test the hbridges, I made it with extra amps and good snubber circuits. I dislike noise in my power lines!! Today, I begin the paint job of Golias V2 body (mobile base only).
My new robot called Golias V2 is under construction. I have new photos in my home page.
2012 Top 10 Robot Christmas Gift Ideas
DARPA Robotics Challenge Kick Off
2012 ASABE Robot Contest Photos
Interview with David L. Heiserman
David Anderson on Subsumption Robots
Review: Apocalyptic AI by Robert M. Geraci
Raspberry Pi Interview with Eben Upton
2012 VEX Robotics World Championship
Giant Dallas Robot Cited as Best Public Art
There's More Than One Way to Skin a Robot
Day of the Androids at Hanson Robotics