7 Jan 2007 (updated 13 Aug 2009 at 18:19 UTC)
»
January 6th, 2007
After waking up at 3PM I cut the mounts for the two
front
motors and welded them onto the frame. I also bought all
the carrier bolts, lock washers, and nuts that I need and
put them in. I bought Home Depot out of 3/8" nylon
washers, and I think I'll have to do so a couple more
times before I have enough. I put bearing grease on the
bolts/washers that I put in so everything pivots smoothly.
I still need to spray the Ace Rust Stop on the new metal.
Go to
http://www.craterfish.org/teamprodigies?pictures?2007/Jan to
see a picture!